Wall Tie Replacement Repairs

Wall ties are an integral part of structural repairs that should be surveyed and installed by recognised professionals.

Wall Tie Replacement

Structural Solutions / Wall Tie Replacement

Wall ties are an important structural component that help to ensure the stability of the outer leaf of a cavity wall against wind loads. The condition and number of wall ties in the structure are important and where corrosion has set in or wall ties are missing or broken, then remedial ties will be required. Solid masonry may also delaminate through broken headers or deteriorated mortar and require remedial tying to ensure future stability.

Corroded Wall Tie in the Cavity

This Picture shows typical wall tie damage where the corroding and delaminating tie in the joint is expanding and causing the mortar joint to crack and de-bond leaving a regular pattern of cracking every six courses on most buildings.

Get in touch with our technical team today!

The MacLennan Answer to the Problem

Helical remedial ties are stainless steel, corrosion resistant and flexible to accommodate natural building movement. They are easy to install and test in the building under repair, leaving nothing to chance. Where drilling through the brick face is not acceptable, then it will be necessary to consider inserting the remedial ties through the mortar bed. This will be satisfactory where the mortar is strong and in good condition. Angled drilling may also be used in special circumstances.

Testing and Spacing

Pre-specification testing should be included as a routine part of the building survey. At least one, and preferably two, ties should be inserted into each elevation at different levels to determine the minimum pull out load obtainable from both near and far leaves. This minimum load should be used as the basis for deciding the density of ties to be installed. This testing is carried out by MacLennan's surveyors when contracts are awarded or for a small cost at tender stage. For a small contract, at least 10 ties must be tested; on large projects 5% of all ties should be tested. For most applications (buildings under 30m high and areas with a maximum wind speed of less than 46m/sec) the minimum tensile proof load is 1kN based on a tie density of 2.5 per m (900mm x 450mm centres). This excludes cladding form masonry and substrates below 100mm deep.

Independent Testing and Approvals

Helical remedial products have been independently and vigorously tested in a wide range of common materials. The testing programme is on-going and to date has been carried out by the Civil Engineering Department of Oxford Brookes University; the Civil & Structural Engineering Department of Middlesex University; The Transport Research Laboratory, Crowthorne and the Building Research Establishment, Garston.

Why should I work with MacLennan?

WE’RE INDEPENDANT

We Design, supply and install. There's no split responsibility with MacLennan.

WE’RE PASSIONATE

MacLennan live and breathe waterproofing, have a look at one of our free CPD seminars and find out!

WE’RE GUARANTEED

MacLennan has the most comprehensive guarantees and insurances in the industry.

Safe Contractorx
PCA
Iso
Full 4th May 2010 06 22 42 Gpi Logo E1443710209909x
Safe 4 Sitex

Get in touch!

Ready to start a project or require more information about us?
Call us about your project or problem and we will be happy to help.


Call us today on:

0330 3200 240
Or email us here