Lift Pit Stockbridge Town Hall
Introduction
Project: Stockbridge Town Hall Project Type: New Basement / Lift Pit Maclennan were contacted by CMS, as we were already dealing with other aspects of the project. CMS had begun to excavate the Lift Pit and it began to fill with water.
Methodology
The injection tube was installed. Then CMS cast the lift pit walls. Maclennan then returned to site and injected the hose with a Polyurethane resin and applied the Vandex waterproof coating.
Result
The work was guaranteed by Maclennan for 10 years and that was underwritten by the GPI which is the only long term waterproofing insurance available.