Lift Pit Stockbridge Town Hall

Introduction

Project: Stockbridge Town Hall Project Type: New Basement / Lift Pit Maclennan were contacted by CMS, as we were already dealing with other aspects of the project. CMS had begun to excavate the Lift Pit and it began to fill with water.

  • Lift Pit Stockbridge Town Hall 3
  • Lift Pit Stockbridge Town Hall 1
  • Lift Pit Stockbridge Town Hall 2

Methodology

The injection tube was installed. Then CMS cast the lift pit walls. Maclennan then returned to site and injected the hose with a Polyurethane resin and applied the Vandex waterproof coating.

Result

The work was guaranteed by Maclennan for 10 years and that was underwritten by the GPI which is the only long term waterproofing insurance available.

Get in touch!

Ready to start a project or require more information about us?
Call us about your project or problem and we will be happy to help.


Call us today on:

0330 3200 240
Or email us here