Author Archive

bs8102:2022 Cover MacLennan

10 recent changes to BS8102 2022 you NEED to know about

Waterproofing standard BS8102 has been revised and the new standard from 2022 has been published this month.

Our MD Ian MacLennan says “We had to change the standards because of the confusion around the grades of waterproofing. We ended up doing a complete revision and added a lot of new best practice guidance. Because the changes are critical and extensive we will provide ongoing support and advice to clients to keep them compliant. Including CPD and training."

bs8102 waterproofing manual

As these are our notes, we encourage you to read the standard for yourself and compare, but overall we feel that what we have written will benefit anyone involved in basement waterproofing design.

Just some of the changes to be aware of are: 

1. It is now written into the British standard that you need to appoint a waterproofing specialist that is adequately qualified and experienced for that type and size of project and by the technical design stage latest if RIBA stages are being used.

We would add that they must have PI for waterproofing design, and accept design liability.”

2. Defects owing to design are now mentioned in the British standard.

You need the qualified, experienced designer from beginning to end to prevent defects .“

3. Twin walls and ICF are now classified as inherently high risk according to the British standard.

4.  (If remedial work isn’t possible, the design should be altered.)

“You have to consider the form and feasibility of repair with the design specialist.

5. The standard says the specialist must have the adequate relevant insurance.

This is incredibly important, waterproofing specialists taking the liability is critical, no split liability can only protect  the client and design team.”

6. Movement joints should not be used below ground unless unavoidable.

“If they absolutely have to be used we can design them but there is lots of advice in the standard. “

7. There is a completely new section on historic buildings.

"We are running a CPD on historic building basement design and compliance with BS8102 2022."

8. A lot of new critical and useful information on Cavity Drain systems.

9. Inverted cavity drain systems. A high-risk scenario in which a specialist is required, IS now written into the standards.

10. A huge section detailing what happens if something goes wrong and remedial works are required. Important information for those considering a less effective waterproofing solution to save costs.

If you want to find out more from an author of the new standard contact us.

We are also offering a free CPD seminar that goes through the new BS8102 : 2002 step by step, book it here.

concrete deck and buried roof CPD advice

New CPD!

We are now offering a CPD on the Waterproofing Design of Concrete Decks and Buried Roofs.
All your design team needs to know on this very specialist subject will be covered in a 1-hour LIVE online CPD.
What is covered:
– How to design a deck or buried roof for waterproofing – Materials options for waterproofing Buried decks and roofs – Environmental conditions critical to waterproofing – Financial considerations with Winter work – How to prepare for waterproofing – Our best advice on systems – Testing and quality control – Guarantees and protecting the client.
To book email cpd@maclennanuk.com
maclennan waterproofing peacock

Hello!

Here is something to brighten up your day! One of MacLennan office pets has come out to pose by the sign with an important message to us all. Keep it #green!
maclennan waterproofing membrane recycling

NEW RECYCLING CERTIFICATE

We are delighted to announce that once again MacLennan has been acknowledged as one of the GREEN companies within our industry and we would like to thank our staff for putting an extra effort in and recycling the unused and leftover materials. 895 kilos of the membrane has been recycled thanks to MacLennan so far and we are only planning on improving this. We all firmly believe that looking after our environment is hugely important on daily basis to keep this planet beautiful for our children, grandchildren and generations to come. Read more on our updated Recycling achievements and our Environmental policy here.

Get in touch!

Ready to start a project or require more information about us?
Call us about your project or problem and we will be happy to help.


Call us today on:

0330 3200 240
Or email us here